page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92 page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
< prev - next > Energy Biogas biogas plants in animal husbandry (Printable PDF)
Filling the plant
Filling means: mixing the substrate with water, removing bouyant materials, allowing the fill material
to warm up, flushing it into the digester, and removing sand and stones. The simple mixing pit
shown in figure 5.16 can handle a daily fill quantity of up to 500 1.
Digested-slurry storage/utilization
The further processing of digested slurry is a critical point in that it can be quite toilsome (cf. chapter
3.4).
In designing the plant, care must be taken to ensure that the slurry store will be large enough.
Fixed-dome plants in particular should be equipped with an overflow, so that the digested slurry
does not have to be hauled away every day.
Daily activities:
- fill the plant
- clean the mixing pit
- agitate the digester contents
- check the gas pressure
- check the gasholder contents
- check the appearance and odor of the digested slurry
Weekly/monthly activities:
- remove/use the digested slurry
- clean and inspect the gas appliances
- check the gas valves, fittings and appliances for leaks
- inspect the water trap
Annual activities:
- inspect the digester for scum formation and remove as necessary by opening the plant
- inspect the plant for water tightness and gas tightness
- pressure-test the gas valves, fittings and pipes
- check the gasholder for rust and repaint as necessary
Monitoring the process
If the plant is properly started before being handed over to the user, it may be assumed to be in
proper working order. The user will have become familiar with what optimum plant operation
involves. This is very important, because from then on he himself will have to watch for any
appreciable changes in how the plant functions; the main indication of a beginning malfunction is a
change in the daily gas output.
7.3 Plant maintenance
The maintenance scope for a biogas plant includes all work and inspections needed to ensure
smooth functioning and long service life. To the extent possible, all maintenance work should be
done by the user.
Biogas plants can develop a number of operational malfunctions. The most frequent problem,
"insufficient gas production", has various causes. Often enough, it takes the work of a "detective" to
locate and remedy the trouble. It may be necessary to experiment with and monitor the plant for
months on end in cooperation with the user.
92