page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89 page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
< prev - next > Energy Biogas biogas plants in animal husbandry (Printable PDF)
Fig. 7.4: Pressure testing a gas pipe. 1 Close all gas
valves and fill the water trap. Find the maximum pipe
pressure, i.e. how high the pressure in the pipe can go
until the water trap blows off (not more than 50 cmWG). 2
Adjust the test pressure with the aid of a manometer-
equipped test pump or the gasholder (10% below max.
pressure). Check the pressure loss after one day. 3 Use
soapy water to detect leaks. (Source: OEKOTOP)
Pressure testing of the gas pipe
The test must be performed while all gas pipe connections are still accessible. Pressurize the gas
pipe with the aid of a test pump or by placing weights on the gasholder. If there is no noticeable loss
of gas after one day, the pipe may be regarded as gaslight.
Initial filling of the plant
The initial filling for a new biogas plant should, if possible, consist of either digested slurry from
another plant or cattle dung. It is advisable to start collecting cattle dung during the construction
phase in order to have enough by the time the plant is finished. When the plant is being filled for the
first time, the substrate can be diluted with more water than usual.
Starting the plant
Depending on the type of substrate in use, the plant may need from several days to several weeks
to achieve a stable digesting process. Cattle dung can usually be expected to yield good gas
production within one or two days. The breaking-in period is characterized by:
- low-quality biogas containing more than 60% CO2
- very odorous biogas
- sinking pH end
- erratic gas production.
The digesting process will stabilize more quickly if the slurry is agitated frequently and intensively.
Only if the process shows extreme resistance to stabilization should lime or more cattle dung be
added in order to balance with pH. No additional biomass should be put into the biogas plant during
the remainder of the starting phase. Once the process has stabilized, the large volume of
unfermented biomass will give rise to a high rate of gas production. Regular loading can commence
after gas production has dropped off to the intended level.
As soon as the biogas becomes reliably combustible, it can be used for the intended purposes.
Less-than-optimum performance of the appliances due to inferior gas quality should be regarded as
acceptable at first. However, the first two gasholder fillings should be vented unused for reasons of
safety, since residual oxygen poses an explosion hazard.
89