page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14
page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88 page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
< prev - next > Energy Biogas biogas plants in animal husbandry (Printable PDF)
Gas-seal testing of a floating-drum plant
In the case of floating-drum plant, only the metal gasholder must be subjected to gas seal testing;
any leaks are detected with the aid of soap water.
Fig. 7.1: Water-seal testing of a digester. 1
Fill the plant with water, Check the fill
levels: 21 Inlet no water in the mixing pit,
22 Digester - at least 10 cm neck height
above water level. 3 Refill to compensate
for moisture absorbed by the masonry. 31
Mark the water level. 4 Measure the drop
in water level as basis for calculating the
water loss (W1 = p r² X h). 5 Repeat
measurements as necessary. (Source:
OEKOTOP)
Fig. 7.2: Seal testing (water and gas) of a
fixed-dome plant. 1 Fill the plant up to the
zero line; Check the fill levels: 21 Gas
extraction points at least 10 cm above
discharge level, 22 Water level in the
displacement pit. 3 Perform water-seal
test and level-drop check (cf. fig. 7.1). 4
Close the entry hatch. 5 Fill with gas up to
maximum a1lowable plant pressure a)
with air (pump), b) with exhaust gas
(vehicle exhaust), 51 . . . until the
displacement pit overflows, or 52 . . . until gas bubbles out of the inlet pipe. 6 Refill the plant to
compensate for saturation losses. 7 Measure the level drop (h) after one day, and calculate the gas
losses. (Source: OEKOTOP)
Fig. 7.3: Gas-seal testing of a metal
gasholder. 1 Place the gasholder in
position with the gas valve closed. 2 Mark
the top edge of the digester neck on the
gasholder. 3 Check the location of the
mark one day later. 4 If the mark is found
to have dropped by 1-3 cm, use soapy
water to check for leaks in the gasholder.
(Source: OEKOTOP)