page 1
page 2
page 3
page 4
page 5
page 6
page 7
page 8
page 9
page 10
page 11
page 12
page 13
page 14 page 15
page 16
page 17
page 18
page 19
page 20
page 21
page 22
page 23
page 24
page 25
page 26
page 27
page 28
page 29
page 30
page 31
page 32
page 33
page 34
page 35
page 36
page 37
page 38
page 39
page 40
page 41
page 42
page 43
page 44
page 45
page 46
page 47
page 48
page 49
page 50
page 51
page 52
page 53
page 54
page 55
page 56
page 57
page 58
page 59
page 60
page 61
page 62
page 63
page 64
page 65
page 66
page 67
page 68
page 69
page 70
page 71
page 72
page 73
page 74
page 75
page 76
page 77
page 78
page 79
page 80
page 81
page 82
page 83
page 84
page 85
page 86
page 87
page 88
page 89
page 90
page 91
page 92
page 93
page 94
page 95
page 96
page 97
page 98
page 99
page 100
page 101
page 102
page 103
page 104
page 105
page 106
page 107
page 108
page 109
page 110
page 111
page 112
page 113
page 114
page 115
page 116
page 117
page 118
page 119
page 120
page 121
page 122
page 123
page 124
page 125
page 126
page 127
page 128
page 129
page 130
page 131
page 132
page 133
page 134
< prev - next > Energy Biogas biogas plants in animal husbandry (Printable PDF)
Following assessment as in table 2.1, the biogas-plant site in question can only be regarded as
suitable, if most of the siting factors have a favorable (+) rating. This applies in particularly to item 2,
the positive energy balance, meaning that the potential biogas production must cover the gas
demand.
If the favorable and unfavorable ratings are fairly well balanced, the more decisive factors should be
re-evaluated to determine the extent to which supplementary measures could provide the missing
conditions for building and operating a biogas plant despite some reservations but without
injustifiable effort. Then, if the overall evaluation does not swing toward the positive side, the plant
should not be built. If the site is given a favorable rating, further planning hints can be taken from
the following checklist.
2.3 Checklist for building a biogas plant
1. Finishing the planning, i.e. site evaluation, determination of energy demand and biomass
supply/biogas yield, plant sizing, selection of plant design, how and where to use the
biogas, etc., ail in accordance with the above planning guide.
2. Stipulate the plant's location and elaborate a site plan, including all buildings, gas pipes,
gas appliances and fields to be fertilized with digested slurry.
3. Draft a technical drawing showing all plant components, i.e. mixing pit, connection to
stabling, inlet/outlet, digester, gasholder, gas pipes, slurry storage.
4. Preparation of material/personnel requirements list and procurement of materials needed
for the chosen plant:
- bricks/stones/blocks for walls and foundation
- sand, gravel
- cement/lime
- inlet/outlet pipes
- metal parts (sheet metal, angle irons, etc.)
- gas pipes and fittings
- paint and sealants
- gas appliances
- tools
- mason and helper
- unskilled labor
- workshops for metal (gasholder) and pipe installation.
5. Material/personnel assignment planning, i.e. procedural planning and execution of:
- excavation
- foundation slab
- digester masonry
- gasholder
- rendering and sealing the masonry
- mixing pit
- slurry storage pit
- drying out the plant
- installing the gas pipe
- acceptance inspection.